1、 The working process of concrete mixing plant
The working process of a concrete mixing plant can be divided into three processes.
One is the process of raw material supply, which mainly uses various conveying equipment to automatically supply cement, aggregates, fly ash and other raw materials to the mixer;
The second is the concrete mixing process, which mainly ensures that various raw materials are evenly mixed in a short period of time by providing sufficient mixing force. At the same time, the mixing time and strength of the concrete can be adjusted appropriately according to the needs of the concrete;
The third is the conveying process, which mainly involves conveying the mixed concrete to the construction site through conveying equipment such as screw conveyors, lifting buckets, etc., in order to achieve continuous feeding.
2、 Key points for selecting concrete mixing plants
Take a look at the production capacity of the concrete mixing plant. Mixing plant equipment with larger production capacity can effectively improve work efficiency and reduce waiting time.
Check the quality of the concrete mixing plant. Users should try to choose well-known brands or reputable manufacturers to ensure the service life of mixing plant equipment and reduce the failure rate of mixing plant equipment.
3、Check the automation level of the concrete mixing plant three times.
Equipment with automated control systems will be easier and more convenient to operate.
Note: The article is sourced from the internet. If there is any infringement, please contact us to delete it. Thank you.