Search...

Measures for optimizing concrete crack resistance

news_banner
Measures for optimizing concrete crack resistance
2023.02.13


1. Control the quality of concrete raw materials

The quality of concrete raw materials has a significant impact on the performance of concrete, and the performance of the raw materials used in the preparation of shrinkage crack resistant concrete must meet the quality requirements of its relevant standards. Therefore, high-quality active admixtures can be selected, using a dual blend of fly ash and mineral powder; The quality of aggregates has a significant impact on the crack resistance of concrete. The mud content and mud block content should be controlled, and well graded medium coarse sand and continuously graded stones with low porosity should be selected; Choose high-performance water reducing agents with high water reduction rate and low shrinkage ratio.

2. Optimize concrete mix proportion parameters

The parameters of concrete mix proportion have a significant impact on the crack resistance of concrete. Therefore, in order to improve the volume stability of concrete, the mix proportion design rules of crack resistant concrete should be followed in concrete mix proportion design: low cement dosage, low water consumption, appropriate water cement ratio, maximum aggregate packing density, as well as the dual addition of active admixtures and high-efficiency water reducing agents. While ensuring compliance with design and construction requirements for workability, efforts should be made to increase the content of coarse aggregates in concrete, reduce sand content and slurry content, while controlling the fluidity and uniformity of the concrete.

3. Other measures to optimize concrete crack resistance

To solve the problem of concrete cracking, the crack resistance performance of concrete can be improved by adding auxiliary crack resistant materials; Surface wet curing can also be applied to large-area concrete; Take insulation or cooling measures for large volume concrete after demoulding; Avoid carrying out on-site construction in rainy, snowy, and windy weather; For underground continuous wall structures, implement backfilling measures.


Note: The article is sourced from the concrete commercial website. If there is any infringement, please contact us to delete it. Thank you.


84aa59d0543a3fd83fea7f232611a7f
b7fce930985808e5b88a361f4f2dfe7

0532-58099990

在线客服系统